The East Africa Crude Oil Pipeline is one of the most significant energy infrastructure projects ever undertaken in East Africa — a 1,443km heated crude oil pipeline connecting the Tilenga and Kingfisher oilfields in Uganda to the Port of Tanga in Tanzania.
project Description
Client:
EACOP (East Africa Crude Oil Pipeline) & CPP
Contractor:
JV SPEK
Project Value:
TZS 100 Billion+
Status:
Ongoing
Location:
Tanzania (multiple regions along pipeline corridor)
Work Scope
JV SPEK was awarded a major package of civil and earthworks contracts along the Tanzania section of the pipeline corridor. The scope of work includes:
- Full earthworks packages — bulk excavation, grading, and compaction along the pipeline route
- Drainage systems—culverts, channels, and watercourse crossings
- Fencing and perimeter security works along the right-of-way
- Site preparation, camp construction, and access road works
- Environmental mitigation and reinstatement works
"JV SPEK exceeded every expectation on our EACOP pipeline corridor project. Their earthworks team mobilized quickly and completed the drainage and fencing installations ahead of schedule. This is the kind of reliable contractor that large energy projects demand."